This project has been a challenge for our platform i-less, since more than 85,000 variables in real time.
The hardware structure is based on a set of industrial PCs distributed over other multimonitor user interface. The system meets all the requirements of functionality and reliability required of such systems. Furthermore, the system will require more extension points that extend, if possible, the functionality. On the one hand, the system publishes a proprietary system to SunEdison variables that the customer needs in real time and on the other hand, exchanges information with the electrical substation that evacuates the energy generated by the plant.

The communication protocols used in photovoltaic solar park of karazhalovo are numerous, among which include Modbus and IEC 68750-5-104, all without resorting to third party software and totally integrated on the same platform.